Installation, Assembly and Retrofitting of Water and Wastewater Treatment Systems
Specialized installation to guarantee safety, efficiency, and reliability from the system implementation stage.
Improper installation of treatment systems can lead to schedule delays, rework, increased construction costs, and compromise the plant's performance during operation.
The ideal time to implement a water or wastewater treatment system is during the construction planning phase. At this stage, activities that require more space and logistics—such as excavations, foundation work, tank installation, and hydraulic and electrical infrastructure—can be carried out in an integrated manner within the construction schedule, reducing rework, additional costs, and interference with already completed stages.
We integrate the hydraulic, mechanical, electrical, and automation systems into the construction schedule, ensuring greater organization during implementation, reduced rework, and a safer system startup.
Services performed
- Mechanical assembly
- Plumbing installation
- Electrical installation
- Pipeline interconnection
- Instrumentation
- Electrical panels
- Automation
- Commissioning
- Start-up
- Retrofit
- NR-10 compliance
- NR-12 compliance
When should you do a retrofit?
Retrofitting is recommended when the system exhibits low operational efficiency, high energy or chemical consumption, lack of automation, a need to increase capacity, or when it needs to be adapted to new technical and environmental requirements.
How we performed the deployment:
CCLM carries out all stages of implementation according to the project specifications, including mechanical assembly, hydraulic installations, electrical installations, automation integration, operational testing, commissioning, and system start-up.
The result is a more organized implementation, with reduced rework, less need for adaptations during construction, and a safer system startup.
Efficiency
“CCLM seamlessly integrated the installation of our wastewater treatment plant into the civil works schedule. The result was a delivery without rework, on time, and with excellent operational efficiency.”
Chemical Industry
4 reasons why your project should be delivered on time (and without headaches):
- Integrated project schedule: Coordinated planning to reduce rework, avoid interference in construction phases, and contribute to meeting the schedule.
- Installation according to project specifications: Hydraulic, electrical, and mechanical systems designed to ensure safety, durability, and ease of maintenance.
- System delivered ready for operation: Assembly, testing, adjustments, commissioning, and start-up performed by a specialized team, providing a safer and more reliable start-up.
- Retrofitting and expansions with minimal disruption: We execute modernizations and expansions using techniques that minimize the impact on the operation and schedule of the project.
A properly executed installation reduces rework, increases system reliability, and contributes to a safer start-up. CCLM executes installation, assembly, and retrofit projects with a focus on quality, efficiency, and meeting the needs of each project.